登录    注册    忘记密码

详细信息

Risk management of project information system operation and maintenance based on Cloud Computing  ( EI收录)  

文献类型:期刊文献

英文题名:Risk management of project information system operation and maintenance based on Cloud Computing

作者:Mao, Qunying[1]

通讯作者:Mao, QY[1]

机构:[1]Xinxiang Univ, Sch Management, Xinxiang 453000, Henan, Peoples R China

第一机构:新乡学院管理学院

通讯机构:[1]corresponding author), Xinxiang Univ, Sch Management, Xinxiang 453000, Henan, Peoples R China.|[110714]新乡学院管理学院;[11071]新乡学院;

年份:0

外文期刊名:INTERNATIONAL JOURNAL OF SYSTEM ASSURANCE ENGINEERING AND MANAGEMENT

收录:EI(收录号:20214511138865);Scopus(收录号:2-s2.0-85118616179);WOS:【ESCI(收录号:WOS:000716322300015)】;

语种:英文

外文关键词:Cloud computing; Engineering information system; Information system operation and maintenance project; Operation and maintenance risk management

摘要:In this experiment, according to the actual situation and content of the project information system operation and maintenance project, combined with the systematic research of relevant literature, the paper proposes to combine the coupling matrix method with the expert survey method to identify the risk factors in the operation and maintenance of engineering project information system. According to the results of risk factors identification, the risk evaluation system is established, and the corresponding risk matrix is constructed, and the risk organization structure is established to complete the risk control. The results show that the top three factors of occupation risk occurrence probability are spare parts arrival and damage (95%), cloud platform data backup and archiving (91%), change control process (90%); the top three factors of occupation risk value are cloud platform data backup and archiving (86.45%), spare parts and arrival (84.55%), change control process (83.70%); the above results show that the operation and maintenance risk of project information system Management should focus on spare parts arrival and damage, cloud platform data backup and archiving, change control process, and other risk factors in high-risk areas. At the same time, the risk management and control measures should be targeted, and the measures taken are different according to the degree of risk; the establishment of the project information system operation and maintenance risk management organization based on the management team structure is conducive to the operation and maintenance risk management.

参考文献:

正在载入数据...

版权所有©新乡学院 重庆维普资讯有限公司 渝B2-20050021-8 
渝公网安备 50019002500408号 违法和不良信息举报中心