登录    注册    忘记密码

详细信息

地下隧道施工盾构端头土体加固三维有限元参数化分析——以天津地铁6号线宜宾道站—鞍山西道站区间隧道开挖工程为例    

Three-dimensional Finite Element Parametric Analysis of Soil Reinforcement at the End of Shield Tunnel Construction:Take the Tunnel Excavation Project between Yibin Road Station and Anshan West Road Station of Tianjin Metro Line 6 as an Example

文献类型:期刊文献

中文题名:地下隧道施工盾构端头土体加固三维有限元参数化分析——以天津地铁6号线宜宾道站—鞍山西道站区间隧道开挖工程为例

英文题名:Three-dimensional Finite Element Parametric Analysis of Soil Reinforcement at the End of Shield Tunnel Construction:Take the Tunnel Excavation Project between Yibin Road Station and Anshan West Road Station of Tianjin Metro Line 6 as an Example

作者:马芸[1];段琼[2];桂超[1,3]

第一作者:马芸

机构:[1]新乡学院土木工程与建筑学院,新乡453003;[2]天津城建大学土木工程学院,天津300384;[3]上海理工大学能源与动力工程学院,上海200093

第一机构:新乡学院土木工程与建筑学院

年份:2020

卷号:20

期号:21

起止页码:8724-8731

中文期刊名:科学技术与工程

外文期刊名:Science Technology and Engineering

收录:CSTPCD;;北大核心:【北大核心2017】;

基金:河南省科技发展计划(182102310833);天津市自然科学基金青年基金(16JCQNJC07700)。

语种:中文

中文关键词:隧道工程;盾构开挖;端头土体;加固范围;数值模拟

外文关键词:tunnel engineering;shield excavation;soil of shield ends;range of reinforcement;numerical simulation

摘要:为确定盾构隧道端头加固所需范围,以天津地铁6号线宜宾道站-鞍山西道站区间隧道工程为背景,基于大型通用有限元程序ABAQUS进行三维建模,土体采用Mohr-Coulomb本构模型,对破除封门及开挖状态下的盾构施工进行了参数化数值分析。结果表明:盾构破除封门状态下,纵向土体最佳的加固长度为9 m。考虑到地下水的影响,端头土体纵向加固长度宜为盾构主机长度加上1.5~2.0 m止水厚度,最后的纵向加固长度宜取12 m;盾构处于开挖状态下,纵向土体加固长度为12 m,盾构机尾即将离开加固区时,盾构机机头与机尾的最大竖向位移为15.5 mm,倾斜角度为0.1°,故此工况下盾构机不会产生“磕头”现象。采用盾构隧道端头加固参数可以确保该区间隧道工程开挖状态下施工安全,对软土地区类似工程具有重要的理论与工程意义。
In order to identify the required reinforcement range of shield tunnel end,the project of subway station of Yibin road station of Tianjin metro line 6 was taken as research object,a 3D model was established based on the ABAQUS for parametric numerical analysis of shield construction under the shield broken and excavated conditions.In this model,the Mohr-Coulomb constitutive model was used for soil.The research shows that the best reinforcement length of the longitudinal soil is 9 m when the shield is broken.Considering the influence of groundwater,the longitudinal reinforcement length of the end soil should be the length of the shield mainframe plus the water stop thickness of 1.5 m to 2.0 m,and the final longitudinal reinforcement length should be 12 m.When the shield is in the excavation state,the longitudinal soil reinforcement length is 12 m,and the maximum vertical displacement of the shield machine head and tail is 15.5 mm,when the shield tail is about to leave the reinforcement zone.The tilt angle is 0.1°.Therefore,the“trick”phenomenon will not occur at the shield machine under this condition.Using the parameter of the shield tunnel end reinforcement proposed can ensure the construction safety of the tunnel project in this section.It has important theoretical and engineering significance for similar projects in soft soil areas.

参考文献:

正在载入数据...

版权所有©新乡学院 重庆维普资讯有限公司 渝B2-20050021-8 